With the rapid industrial growth in Cikarang – particularly in Lippo Cikarang – wastewater volumes have increased significantly. The existing WWTP requires capacity expansion as it can no longer accommodate these additional wastewater flows.

PT Lippo Cikarang has entrusted Environusa with designing a WWTP Extension with:

  • Treatment Capacity: 1,500 m³/day (MPD)
  • Effluent Quality: Compliant with environmental standards
  • Water Reuse: Minimum application for landscape irrigation

Design Scope Includes:

  • Process engineering design
  • Structural design
  • Mechanical, electrical, and instrumentation (ME&I) systems

This expansion project will ensure sustainable wastewater management while supporting the area’s continued development.